This wouldn’t be a problem if we still had NASA doing the shuttle program, or some continuation of it, rather than outsourcing our spacecraft to the cutthroat lowest-bidder private sector. Is it really any surprise that SpaceX and Boeing are blowing up on the launchpads and having quality control issues when their sole objective is to make money? If we nationalized these initiatives again and cancelled the private contracts with these crooks, there would be no incentive for profiteering and corners would not get cut as often as they do now.
Sure, it would be a big cost to the taxpayer once again, but I think I’d rather have a reliable space program and like 2% less military budget to fund it, I think we’ll manage somehow without producing more tanks and planes that nobody is asking for.
This wouldn’t be a problem if we still had NASA doing the shuttle program, or some continuation of it, rather than outsourcing our spacecraft to the cutthroat lowest-bidder private sector.
While I like the sentiment, you should know that you are absolutely, completely, 100% wrong.
The space shuttle was the deadliest spacecraft in human history, not just in the US, but in the entire world. And mind you, NASA spacecrafts are all also quite literally built from parts delivered by the lowest bidder.
For the record Boeing sucks and is doing a pretty crappy job right now, but regardless, it would be safer to launch on the Starliner 20 times in a row than to ride in the space shuttle once. At least the Starliner has a launch escape system.
To be fair to the shuttle though, it is objectively cool. While not a good way to get to space, that thing was awesome in every sense! I truly wish I had gotten to see it launch in person. Also the RS-25, the main engine, is a pretty badass rocket engine, there was so much about that vehicle that was great, it’s a shame that it never quite fulfilled its promise.
I followed the Space Shuttle program pretty heavily as a kid and got to see a few launches from the Cape.
Truly loved the innovative look and the futuristic (lol, at the time) feel.
In retrospect, it was a good try with bad funding, and an exceptionally expensive satellite positioner that never lived up to its promised turn around time.
I loved it, but it kind of was an objective flop.
NASA blew up a fair few rockets, and lost two shuttles, so that’s not necessarily the better option.
Fair point, I don’t want to fixate on that one aspect of the colossal technical challenge that is getting spacecraft into orbit, but I’m still of the opinion that a nationalized and fully government-funded space program will always yield better results than a privatized one because there is no profit-taking incentive.
Is it really any surprise that SpaceX and Boeing are blowing up on the launchpads and having quality control issues when their sole objective is to make money?
I mean, spaceX has a fantastic track record. In their entire history, they only once failed to deliver a payload to orbit, and that was like just a month ago that they had their first failure after well over 300 successful launches. That’s record setting reliability in orbital rockets.
They blow up a lot of rockets in testing and development, but that’s kind of just how rocket development goes. It’s the same for NASA, Russia, and everyone else who designs rockets. You blow some up during development.
I’m just saying, I’m not sure you can lump SpaceX and Boeing together, they’re very different companies with very different track records.
Who do you think built the shuttle…?
Also, not defending the Musk shitstain, but focusing on “blowing up launch pads” tells me you probably know very little about the Space industry or development.
I probably should have been more specific, though you’re right.
They seem to think though that NASA themselves did most of the design and manufacturing or something, instead of farming a ton of it out to various contractors (Thiokol, etc). That absolutely happened with STS.
In fact, the Space Shuttle is where costs and time frames and project management and etc started to go off the rails - and led to where we are with Boeing and others today. It’s a bad one to choose to make his point - even if we were actually still getting SOME shit done back then and the situation hadn’t deteriorated so badly.
but focusing on “blowing up launch pads” tells me you probably know very little about the Space industry or development.
That wasn’t the focus of my post, but are you suggesting that there is a nonzero number of rocket explosions that would be considered acceptable?
I don’t need to be Elon Musk, or even know much about the space industry or development to know that the target number should always be zero.
but are you suggesting that there is a nonzero number of rocket explosions that would be considered acceptable?
…yes? During development specifically. Of course there is.
There is a reason we moved this to the private sector. Govt bureaucrats can’t get out of their own way and every project triples in cost, with no single person calling the shots to get the job done. Govt cannot keep up with the pace we need.
Boeing is hot garbage.
SpaceX has a shit face, but they are incredibly competent and effective at iterating their way to space.
NASA in-house projects were historically expensive because they took the approach that they were building single-digit numbers of everything – very nearly every vehicle was bespoke, essentially – and because failure was a death sentence politically, they couldn’t blow things up and iterate quickly. Everything had to be studied and reviewed and re-reviewed and then non-destructively tested and retested and integration tested and dry rehearsed and wet rehearsed and debriefed and revised and retested and etc. ad infinitum. That’s arguably what you want in something like a billion dollar space telescope that you only need one of and has to work right the first time, but the lesson of SpaceX is that as long as you aren’t afraid of failure you can start cheap and cheerful, make mistakes, and learn more from those mistakes than you would from packing a dozen layers of bureaucracy into a QC program and have them all spitball hypothetical failure modes for months.
Boeing, ULA and the rest of the old space crew are so used to doing things the old way that they struggle culturally to make the adaptations needed to compete with SpaceX on price, and then in Boeing’s case the MBAs also decided that if they stopped doing all that pesky engineering analysis and QA/QC work they could spend all that labor cost on stock buybacks instead.
I agree with everything you say and I am all about the way that you captured the dysfunction of the political apparatus and its inability to deliver for a price and on a date. I think my argument is that that’s exactly why the government should not be in charge of this stuff. It should not be political. I don’t think there’s any way to avoid billboards in space, but at least we’ll be able to finally get out there.