Of course there is an alternative, as the article is arguing implicitly, you ban mining and other unsightly industrial activities in rich areas with strong environmental and safety laws, and outsource it to poor nations without the political leverage to strongly regulate mining companies. This objectively results in far, far more environmental damage, but that environmental damage is contained to highly populated areas full of poor people you don’t have to think about.

I really wish more environmentalists were pushing for potentially environmentally hazardous processes to be moved to areas with strong regulation and environmental protection laws, instead of just pushing them onto poor people, but unfortunately a lot of people seem to be so (purposely) disconnected from the industrial processes necessary to make everything from wind turbines and trains down to the food that appears on the shelves that they view the mining and manufacturing of these things as completely unconnected to these things themselves appearing in their lives.

permalink
report
parent
reply

As to solar, payback is usually 7-15 years depending on overhead costs, while most panels are still at 80% output in 20 to 25 years. Batteries don’t last as long as panels when being used to near capacity, but they’ll still do about half the lifespan of the panels. Batteries prices are also falling about as quickly as panel prices, with us now being in the neighborhood of 100 dollars per kwh of storage.

I also think it’s a bit of a misnomer, especially on this instance, to consider these things completely dead and worthless at 80% effectiveness, especially when that is still far more effective than a brand new top of the line one a decade ago. I think that there are a lot of people in the world who wouldn’t mind the system taking up 25% more space if they could get them much cheaper, it’s just that much like EV battery range, a lot of people are finding that they don’t really need to replace the thing away at 80% capacity in the first place.

permalink
report
parent
reply

Yes, presumably because 50 minutes is about as close as an experienced passenger can cut it if you get on right as the doors close, which we are also assuming for the train, when he researched that specific flight the time presumably came out five minutes longer than you did, and yes.

permalink
report
parent
reply

Typically this channel includes the airport arrival wait already, which is where the fifty min difference comes from, and the city to city times is to account for time taken to get to and from the city center from the airport terminal.

permalink
report
parent
reply

Typically not for more than a few hours when it comes to in service track, and management actively despises those maintenance windows even when it’s necessary to the continued existence of the track, much less a third party startup.

There is a reason why even when the entire track and ballest on a main line are wiped out by a natural disaster it will usually be up and running again in a few days.

As such I would expect any non experimental contracts between the startup and the railway to come with not insignificant financial penalties if they interfere with service, such as requiring a shutdown of the track for repairing the panels being subjected to said harsh environment, thusly either delaying fixing the panels for the next scheduled major maintenance window in a few years or else like most railway inspections doing the work an an active line between trains.

When the competition is a large open field of dirt that can be accessed at any time for maintenance, can leave the panels up for decades, is centrally located for easy grid access, and requires far less frequent cleaning, I just don’t see how this startup is going to outperform.

permalink
report
parent
reply

Don’t forget that maintaining all this means people working directly in the track trying to fix high voltage electrical issues while dodging trains and hoping dispatch doesn’t forget about them, or that ballast(the gravel between the ties) needs to be renewed regularly, much less all the things like realignment and rail grinding that use specialized machinery that needs to go right in the space between the rails.

This means that those panels are going to have to be removed and installed often, at best vastly increasing wear and tear on them as compared to a fixed installation, and adding the risk that a failure in the pickup/deployment process could scrap a significant number of panels if not caught immediately.

Or that the hard part of installing solar panels is the wireing, inverting, and grid interconnection, all of which are just made that much harder by having to have electricians doge trains.

Look, if there really is absolutely no possible available space, like say desert, farmland, roofs, parking lots, yards, fences, well just put the panels up on a simple metal frame over the railway, maybe even integrate the catenary hangers if your feeling daring.

This at least provides some benefit to running the railway by keeping snow and leaves off the tracks to some extent while also keeping the panels out of the way of running the railroad.

permalink
report
parent
reply

But have you considered how much worse the poor NIMBY’s views out their windows will be, why you might even see something more interesting than desert, the horror./s

permalink
report
parent
reply

If it is it’s not current, as the storm has dropped to a category 3 as it neared land. We were up to 171mph a few days ago as it was building though, so it may just be a forecast from around then.

permalink
report
reply

Ya, if the article is using Finish survey data than it’s definitely ridiculous to talk about it being powered by coal, I had assumed that given the article’s presentation they were at least looking at gobal statistics.

Given the the title of the paper they got this from, if they are not getting paid by an oil company somewhere already they really should work on collecting the free money for the work they are already doing.

permalink
report
parent
reply

Technically, it’s not wrong that worldwide the largest method of electricity generation is coal, but it does tend to be far smaller and shrinking in the richer western nations with lots of EV’s people are probably thinking of, even before getting to the whole electricity is on track to be made carbon neutral a lot sooner than gasoline thing.