6 points
Those 800 wind turbines can be built in a month. Building a nuclear plant takes decades. And nuclear fuel reprocessing had never been economical by a long shot. Your pipe dreams will always regain just that and that’s before we even start talking about proliferation and nuclear waste.
7 points
Building a nuclear plant takes decades.
In China they do it in 6 years…
https://www.statista.com/statistics/712841/median-construction-time-for-reactors-since-1981/
-6 points
3 points
And in those 6 years, you could have built over 6x that capacity in renewables, easy.
3 points